Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Retaining Walls ยท Northern Beaches Steep coastal blocks. Walls built to hold.

From Manly to Palm Beach, Northern Beaches blocks are steep, sandy and exposed to salt air. We design and build retaining walls that suit the slope, the soil and the coast, and get them approved.

  • Northern Beaches retaining walls
  • Steep block specialists
  • Sandstone & concrete sleeper
  • Gabion & engineered walls
  • Council approvals handled
  • Free site assessment
Talk directly with the builder0415 840 500

Free Northern Beaches wall quote

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Site assessment and written quote
24h
Itemised quote after the site visit
$20M
Public liability insurance cover
Building on the Northern Beaches

Slope, sand and salt air.

Many Northern Beaches homes sit on steep escarpment blocks or sandy coastal soils. Both put retaining walls under real pressure: steep sites carry more load, and sandy soils drain and shift differently to the clay found elsewhere in Sydney.

Coastal exposure matters too. Salt air speeds up corrosion of steel posts and reinforcement, so material choice and galvanising matter more here than inland. Natural sandstone and well-built concrete sleeper or gabion walls perform well on the coast.

Northern Beaches Council has its own rules for retaining walls, including height limits, setbacks and landslip and bushfire considerations on some sites. We check the controls for your property and handle the approval when one is needed.

Concrete sleeper terraces on a steep Dee Why block
NBNorthern Beaches
Is this you?

Common Northern Beaches wall jobs

If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.

Terracing steep blocks

Breaking a steep slope into level terraces for lawns, gardens and pools.

Replacing old timber walls

Rotted treated pine walls swapped for concrete sleeper, sandstone or block.

Driveway retaining

Walls along steep driveways and parking areas, engineered for vehicle loads.

Pool surrounds

Retaining walls that support pool excavations and surrounds on sloping sites.

Coastal sandstone walls

Natural sandstone walls that suit the local landscape and weather well.

Failing or leaning walls

Repairs and rebuilds where poor drainage or salt corrosion has caused failure.

On a steep Northern Beaches block? Send us a few photos and we will tell you what is possible.

Walls we build

Retaining walls for Northern Beaches homes.

We recommend the wall that suits your slope, soil, budget and the look of your street.

01

Concrete Sleeper Walls

Popular, cost-effective and durable, with hot-dip galvanised posts for coastal sites.

02

Sandstone Walls

Natural sandstone blocks that match the Northern Beaches landscape and last for generations.

03

Gabion Walls

Free-draining rock-filled baskets that suit steep, wet and sandy sites.

04

Engineered Concrete Walls

Reinforced block and concrete walls for tall walls, driveways and boundaries.

05

Terracing & Garden Walls

Multiple low walls that turn a steep slope into usable outdoor space.

06

Repairs & Rebuilds

Failing, leaning and rotting walls fixed or replaced with proper drainage.

Recent work

Northern Beaches walls we have built.

A selection of recent Northern Beaches retaining walls across Sydney.

View all projects
Our process

From site visit to finished wall.

Every Northern Beaches wall follows the same five steps.

Site Assessment

We inspect the wall, the ground behind it, the drainage and what sits above it, and measure the lean, cracking or movement.

Diagnosis & Engineering

We work out why it is failing and bring in a structural or geotechnical engineer where the height, load or boundary requires it.

Itemised Quote

A written quote that sets out repair or rebuild options, drainage, access, approvals and timing. No vague lump sums.

Repair or Rebuild

Our crew stabilises or replaces the wall with proper footings, ag drainage, aggregate, geotextile and weep holes.

Handover

Clean site, photos of the footings and drainage before backfill, and engineer sign-off where applicable.

Built for the slope and the salt.

Galvanised steel, proper drainage and engineering for the load, so your wall stands up to coastal conditions.

Why choose METCON

Northern Beaches retaining wall builders.

We build retaining walls across the Northern Beaches, including steep sites that need machinery access, engineering and council approval.

Drainage First

Every wall we build or repair gets ag drainage, clean aggregate, geotextile and weep holes. Water is what breaks walls.

Engineered Where It Matters

Walls over about a metre, on boundaries or holding up driveways are designed by an engineer to AS 4678.

Licensed & Insured

Builder Licence 384697C, $20M public liability and workers compensation on every site.

Approvals Handled

We check council rules, prepare the paperwork and lodge the CDC or DA when a wall needs one.

All Wall Types

Concrete sleeper, timber, sandstone, gabion, block and reinforced concrete. We recommend what suits the site, not what we prefer to sell.

40+ Years Experience

Family builders on Sydney sites since the 1970s, including steep blocks other builders walk away from.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from homeowners, strata and builders.

Council approval sorted, engineering sorted, wall done in a week. Could not fault the process.
DRDavid Reeves Manly
Our sandstone wall was crumbling and the whole garden was sliding. Constantine came out the next day, explained everything clearly, and the new wall is rock solid.
JTJames Thornton Dee Why
METCON replaced our failing timber wall with concrete sleepers. Straightforward quote, tidy site, and it looks fantastic.
SMSarah Mitchell Mosman
Retaining Walls Northern Beaches FAQ

Common questions.

Straight answers from the builder. Anything else, just ask.

Do I need council approval for this wall?

It depends on the height and location. As a general guide in NSW:

Under 600mmUsually exempt, no approval required.
600mm to 900mmMay need a CDC or DA, depending on your council.
Over 900mmAlmost always a DA, engineering drawings and possibly a geotechnical report.

We check your council's rules and handle the application for you.

Do I need drainage behind the wall?

In almost every case, yes. Poor drainage is the number one cause of retaining wall failure. We install ag-drainage, gravel backfill and weep holes as standard on every wall.

Can you build on a steep or hard-to-access block?

Yes. Steep sites are a large part of what we do. We use compact machinery, staged excavation and engineered designs, and plan access for spoil removal and materials before we start.

How long does it take to build?

A standard residential wall typically takes 3 to 10 working days, depending on length, height, access and whether excavation or engineering is involved. Walls that need council approval can add 4 to 8 weeks for the approval process.

Other wall types

Compare other walls.

Not sure this is the right wall for your site? Compare the other systems we build, or ask the builder.

Back to Retaining Walls
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

Where we work

Retaining walls across the Northern Beaches.

We build and repair retaining walls in every Northern Beaches suburb, from Manly and Dee Why to Avalon and Palm Beach.

ManlyDee WhyCollaroyNarrabeenMona ValeNewportAvalon BeachPalm BeachFreshwaterCurl CurlBrookvaleFrenchs ForestBelroseForestvilleBalgowlahSeaforthFairlightClontarfAllambie HeightsCromerElanora HeightsWarriewoodBayviewChurch Point+ Greater Sydney
Let's get started

Tell us about your block.

Your suburb, a few photos of the slope and roughly how long and high the wall needs to be is enough to start.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Free Quote